Showing posts with label floor. Show all posts
Showing posts with label floor. Show all posts

Wednesday, October 3, 2007

Marmoleum Installation: Part 3


I finally finished putting the shoe moulding around all the cabinets and the reducing moulding between the kitchen and the hardwood in the dining room.



This is the base moulding behind the refrigerator, primed, filled, and ready for paint.



Here's a nice shot of the cast iron toe-kick vent I got from Signature Hardware. Pity nobody will ever notice it.


These are all of the tools I used to install the Marmoleum, plus my power miter saw that's not in the picture. I used my 12" miter saw to make all of the full-length cuts, which required me to cut most of the way through, then rotate the piece 180-degrees and finish the cut. A table saw would have been preferable, but I don't have one.

The hack saw was very handy for cutting small notches when needed.

The big black bar is absolutely necessary. Don't even thing about installing this kind of flooring without one. You can use a piece of wood as a tapping block when laying the tiles in the middle of the floor, but when you get to the cut pieces around the perimeter of the room there is no way to tap the pieces into place without the bar. Go to your local big box and spend the $10 if you don't already have one.

Saturday, July 7, 2007

Marmoleum Installation: Part 2

I got the bulk of the work done on the flooring. I thought it was going to take forever to do all the cut pieces around the perimeter of the room, but once I got in the zone it went pretty quickly. I still need to do all of the base shoe moulding and some of the perimeter pieces that are not visible in this picture.

I'll post a final message about the floor once it's 100% complete.